Log in


4.6.23 | Bye Bye Armour Drive Potholes + Cheshire Bridge Fully Open

April 06, 2023 2:50 PM | Anonymous

This week we're CELEBRATING NO MORE POTHOLES ON ARMOUR DRIVE @ UNDERPASS AND CHESHIRE BRIDGE IS FINALLY FULLY OPEN!!! 

Our volunteer organization dedicates over 30+ hours to infrastructure issues within our community that impact businesses each month.  Working with the City of Atlanta is a slow, steady process and the number of businesses within our organization makes a difference when we're advocating for changes.

Thank you for supporting the PiHi Alliance. If you appreciate the difference we're making for your business, please consider joining by paying for membership by the month. Annual membership is also available.

JOIN AND PAY ONLINE

ARMOUR DRIVE POTHOLES ARE GONE!!
Thank you to Atlanta Department of Transportation! 


We appreciate all of your patience over the past years as we worked to find a more sustainable solution to the dangerous ongoing potholes on Armour Drive at the underpass. Perseverance pays off! 

This is a TEMPORARY solution to the LONG TERM PLAN to replace the storm water drain system and repave the entire Armour Drive curve at the underpass with concrete within the next 12-18 months.

We understand it's not perfect as there is still some standing water. Be assured, no more tire busting potholes lurk below the surface!! 

Thank you to PiHi Alliance members Christ CovenantCappella Cheese and Armour Yards for providing us with updates and photos! 
 

NEXT STEP: LANE STRIPING WILL HAPPEN WITHIN THE NEXT 14 DAYS!
We've been assured this will happen before SweetWater 420 Fest
on Saturday April 22nd at the Brewery. 

SEE MORE ATL311 WINS! 

CHESHIRE BRIDGE IS FULLY OPEN! 

It's been a tough few years for Cheshire Bridge businesses with the bridge being under construction. The PiHi Alliance worked with ATLDOT and District 6 councilmember Wan to make sure the bridge was opened as soon as possible from the minute it burned down in August 2021. 

  • We started a petition, continuously called and emailed the City, communicated construction updates, discounted membership to Cheshire Bridge businesses, installed 5 banners promoting Cheshire Bridge corridor businesses and attended the first milestone ribbon cutting of one lane opening in October 2022.   
  • Thank you to ATLDOT and District 6 for keeping this project on track and completing on schedule!!


We are so pleased to be celebrating with all of you this joyous occasion of a new, full open bridge connecting all the businesses of Cheshire Bridge from Piedmont to LaVista!!  


FIRST EASTER EGG HUNT @ NAKATO THIS SUNDAY

The fun will kick off at 3pm when children 12 and under participate to find Easter Eggs with lots of fun prizes from Richard's Variety Store, including one grand prize of a $100 Gift Card to Nakato!

MAKE YOUR RESERVATIONS: 
ONLINE  or by phone  (404.873.6582)  with number of children participating. Only children who RSVPed in advance will be able to participate in the Easter Egg Hunt.

Nakato is open 3:30pm-9pm this Easter Sunday, April 9th.

DISCOVER@PIHIALLIANCE.COM

1579 MONROE DRIVE

SUITE F, BOX 226

ATLANTA, GA 30324

Powered by Wild Apricot Membership Software